Skip to main content

2022.05.10 version update-process Special update

1. Optimize the upgrade description

1.1 Process return function

Optimization points:

Add the selection of approval transfer methods after the process is returned, including:

  • 重新依次审批:If the process node is A> B> C ,C returns the process to A, and the process will re-flow according to the link of C> A> B> C, each node triggers message notifications and business rules.
  • 从当前节点审批:If the process node is A> B> C and C returns the process to A, the process will flow according to the link of C> A> C, and does not trigger the corresponding message notification and business rules.


Optimization of return function

Instructions

  • If the approval Button is at the same timeIf the configuration is returned and added, and the configuration item in the addition is also added with the "return" button, the return function is executed according to the return logic of the approver node.
  • If the approval button is only configured with the add tab and the return function in the add tab function is enabled. At this time, the approver cannot perform the return operation, but the additional person can perform the return operation and follow the selected return logic.

1.2 process View/comment function

Before the update:

🚫Process participants can only view the approval details of their nodes.

🚫Only platform/application administrators have comment permissions.

🚫The number of attachments in the comment area is limited to 2.

🚫Comments do not support uploading attachments in ppt format.

After optimization:

Permissions are optimized, and the types of attachments in comments are increased. Include:

查看及评论权限:Process participants can view the process after the process is initiated, and all participants have the permission to view and submit comments.

评论中附件数量上限提升:Up to 5.

新增附件种类:The attachment in the comment area adds support for ppt format based on the original format.

1.3 quick approval function

Before the update:

🚫Click the chat window to receive the process approval card. Only a new page can be opened to view the process details or approve the process. Users need to frequently jump to the page.

Process page

Pre-update process Card

After optimization:

Quick approval. The process approval card supports operation on the Approval Form, reducing the number of page jumps and making approval easy in the chat window.

Process page

Optimized process Card

2. Bug fixes

This iteration fixes the following bugs, including:

修复Integration & automation when the add data node is in use, if a field does not have a value, the bug uniquely identified by the component is passed by default.

修复A bug in which the fields required by the integration & Automation initiate approval node are inconsistent with the configuration of the process initiator node.

修复When the mobile terminal submits flow chart, the system automatically repeats the submitted bug.

-------------------- Get the latest information YIDA, welcome to follow US--------------------

This doc is generated using machine translation. Any discrepancies or differences created in the translation are not binding and have no legal effect for compliance or enforcement purposes.
Copyright © 2024钉钉(中国)信息技术有限公司和/或其关联公司浙ICP备18037475号-4